vacuum_ovens
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
vacuum_ovens [2024/10/15 17:39] – [Identifying and Handling Liquid Oxygen] mbates | vacuum_ovens [2024/10/16 19:18] (current) – mbates | ||
---|---|---|---|
Line 30: | Line 30: | ||
1. Acquire Liquid Nitrogen: | 1. Acquire Liquid Nitrogen: | ||
- | * If there' | + | * If there' |
2. Inspect Vacuum Manifold: | 2. Inspect Vacuum Manifold: | ||
- | * Check the vacuum manifold for cracks. If any are found, report this finding to a BioPACIFIC MIP staff member, do not proceed to use the vacuum oven. | + | * Check the vacuum manifold for cracks. If any are found, report this finding to a BioPACIFIC MIP staff member, |
3. Prepare the Vacuum Trap: | 3. Prepare the Vacuum Trap: | ||
Line 39: | Line 39: | ||
4. Prepare the Vacuum Oven: | 4. Prepare the Vacuum Oven: | ||
- | * Ensure both purge and vacuum knobs are closed. Place samples inside the vacuum oven chamber, latch the door shut, and write your name, date, and time on the whiteboard. | + | * Ensure both purge and vacuum knobs are closed. Place samples inside the vacuum oven chamber, latch the door shut, and write your name, date, and time in the logbook. Ensure that your reservation is also recorded in FBS. |
5. Start the Vacuum Pump: | 5. Start the Vacuum Pump: | ||
- | * Close all Teflon knobs on the vacuum splitter, then turn on the vacuum pump. Ensure the vacuum gauge reads <100 mTorr. | + | * Close all Teflon knobs on the vacuum splitter, then turn on the vacuum pump. Ensure the vacuum gauge reaches |
6. Connect the Vacuum Pump to the Cold Trap: | 6. Connect the Vacuum Pump to the Cold Trap: | ||
- | * Open the Teflon knob on the vacuum splitter connecting the vacuum pump to the cold trap (0.5 to 1 rotation is sufficient). Ensure <100 mTorr is maintained on the gauge. | + | * Open the Teflon knob on the vacuum splitter connecting the vacuum pump to the cold trap (0.5 to 1 rotation is sufficient). Ensure <100 mTorr is reached and maintained on the gauge. |
7. Set Up the Cold Trap: | 7. Set Up the Cold Trap: | ||
Line 84: | Line 84: | ||
19. Handle Remaining Liquid Nitrogen: | 19. Handle Remaining Liquid Nitrogen: | ||
- | * Pour any remaining LN2 from the dewar back into the 10 L dewar. | + | * Pour any remaining LN2 from the cold trap dewar back into the 10 L dewar. |
20. Clean the Cold Trap: | 20. Clean the Cold Trap: |
vacuum_ovens.1729013945.txt.gz · Last modified: 2024/10/15 17:39 by mbates